| Architecture |
| Address |
Scheidemannstrasse /Ebertstrasse |
| Architect |
Foster and Partners |
| Completed |
1999 |
| Total Floor Area |
61,166m2 |
| Height |
47m |
|
|
| Glass |
| Dome |
High-transparent laminated glass |
| 12mm high-transparent tempered glass + 1.52mm interlayer + 12mm high-transparent tempered glass |
| Chamber wall glazing |
Fire resistant double glazing |
| 48mm thick in total with Pyrostop or Pyrodur |
| Top Light |
Fire resistant double glazing |
| 53mm thick in total with Low-E glass & Pyrodur |
|